AI-generated photographs
Custom homes in the Calder Valley
Built from the blueprint up
Six homes a year, each drawn with you, priced in writing before we break ground and walked with you every Friday until you get the keys.
Blueprint
Every home starts as a drawing you can still change. We draw it with you, to the inch, before anything is ordered.
Foundation
Footings, walls and slab, poured and cured on your lot. Weeks 1 to 3.
Framing
Walls, floors and roof trusses go up. You walk every room before a single wire runs. Weeks 4 to 9.
Dried in
Sheathing, house wrap and the roof close the shell against the weather. Weeks 10 to 12.
Exterior
Board-and-batten and lap siding, fieldstone and cedar posts with knee braces. Weeks 13 to 18.
Home
Lawn in, lights on. A final walkthrough and a punch list we close before you move in. Weeks 31 to 32.
Welcome home
Keys on the kitchen island, and your one-year warranty walk is already on the calendar.
One crew, one family, one build at a time
- 6
- homes a year, so the same site lead runs yours from the first footing to the keys
- 1 price
- in writing before we break ground, with every allowance listed by line
- Fridays
- a site walk or a photo set and a ten-minute call, every week of the build
Three plans we know by heart
Each plan is a starting point. Most families move a wall, add a mudroom or turn the garage, and the price changes in writing before the drawing does.
-
The Ridgeline
The house on this page. Two front gables, a deep cedar porch and a mudroom wing off the garage.
- Bedrooms
- 4
- Baths
- 3.5
- Floor area
- 3,240 sq ft
- From
- $1,140,000 on your lot
-
The Millbrook
One story with the main bedroom on the ground floor and a vaulted great room under one long ridge.
- Bedrooms
- 3
- Baths
- 2.5
- Floor area
- 2,480 sq ft
- From
- $865,000 on your lot
-
The Tohickon
A tall main house with a lower wing for a guest suite or an office with its own door to the yard.
- Bedrooms
- 5
- Baths
- 4
- Floor area
- 3,900 sq ft
- From
- $1,390,000 on your lot
Eleven months, written down on day one
The schedule below is the one in your contract. When weather or an inspection moves a date, you hear it from your site lead that week, with the new date.
- Months 1 to 3
Design and permits
Plan changes, the written price, engineering and the township permit.
- Weeks 1 to 3
Site and foundation
Clearing, excavation, footings and the slab, with a survey before the walls.
- Weeks 4 to 12
Framing and dry-in
The frame walk with you, then sheathing, wrap and roof so the inside stays dry.
- Weeks 13 to 30
Systems, exterior and finishes
Mechanicals and the inspections, siding and roof, then cabinets, tile and trim.
- Weeks 31 to 32
Walkthrough and keys
The punch list, closed in writing, and the keys on a day you choose.
AI-generated photograph
Start on your lot, not in an office
Tell us where the land is. We walk it with you, talk about where the sun comes up and where the house could sit, and you leave with a rough number.
Book a site walk